Checklist 1.1 Final Site Inspection & Release
Checklist 2.1 Geotechnical Assessment - Scheme Plan approval
Checklist 3.1 Basecourse Shape and Relative Height
Checklist 3.3 Sub-Base Compaction/Shape
Checklist 3.5 Scala Penetrometer Test
Checklist 4.1 Stormwater & Wasterwater Pipe Laying Checklist
Checklist 4.3 Trench Backfill Compaction Test Summary
Checklist 4.5 Final Inspection for Stormwater and Wastewater Drainage
Checklist 4.7 Landscape Engineering Stormwater Device Management Manual Checklist
Checklist 6.1 Water Reticulation Pipe Laying Checklist
Checklist 6.3 Final inspection for Water Reticulation
Checklist 7.1 Street Trees & Gardens - Pre-defects Liability Period Inspection
Appendix 2 SItems to be Corrected of Requiring Action
Appendix 4i Certification Upon Completion of Roads, Pipelines and Other Services
Appendix 4ii Producer Statement - Construction
Appendix 4iii Certificate for As-Built Drawings
Appendix 5i Requirements & Procedures for Legal Documentation for Minor Works Bonds
Appendix 5ii Requirements & Procedures for Legal Documentation
Appendix 6 Application for Acceptance of Water or Drainage Product for use in the HCC Water Supply Area or Drainage District
Appendix 8 Subdividers/Developers Tax Invoice