3.0    Construction or Alteration of Stormwater Systems

 

3.5    Design Constraints

All proposed stormwater systems and any proposed alterations to any existing stormwater systems, must be designed, constructed and operated in accordance with:

  1. The Council’s Engineering Standards (as a minimum); and
  2. The relevant Catchment Management Plan (if applicable); and
  3. The Matamata-Piako District Plan; and
  4. In the case of a building development, compliance with the New Zealand Building Code Clause E1 Surface Water (or its successor), as a minimum; and
  5. Any discharge, building or other consents relevant to the works; and
  6. Any written conditions imposed by Council when approving the works.

 