3.0 Construction or Alteration of Stormwater Systems
3.7 As-Built Plans
As-built plans showing details of all new connections or alterations shall be provided to the Council within the time frame specified in Council’s written approval.
As-built plans showing details of all new connections or alterations shall be provided to the Council within the time frame specified in Council’s written approval.