Return to home page

Part 5 – Wastewater Drainage

5.17    Testing

All wastewater mains and branch pipelines, including extended connections, are to be flushed, CCTV inspected, then tested using the low pressure air test.

Note:  The low pressure air test is described in the MPDC Infrastructure Code of Practice.