8.2 Development Controls
The following development controls apply, rather than Sections 3.1 to 3.4 to the activities listed below:
- Landscape planting to a minimum depth of 3 metres shall be developed and maintained around the perimeter of any of the above activities. Landscape planting shall be assessed in accordance with Section 1.4.1 (iv).
- All Yards
Minimum 3m
- Electrical Substations and Switching Stations above and including 66kv
- Electrical, Radio, Telecommunication and Council Depots or workshops,
- Telephone exchanges,
- Radio, Meteorological or Telecommunication buildings greater than 30m2 gross floor area,
- Gas compressor stations valve and take off stations, sales gates and regulator stations, but excluding standard regulator stations with a maximum floor area of 3 m2 and maximum height of 2m.
- Windmills, wind power generators,
- Community solid waste management sites, sewage treatment plants
- Water reservoirs, hydro electric power stations, geothermal natural gas biomass and coal-fired generators of electricity facilities
| Objectives/Policies | ||
| 3.5.2.1 | O1, O2 | P1, P2, P3, P4 |