Return to home page

Part 4 – Stormwater Drainage

4.17    Ramped Risers

Unless required otherwise by Council, a ramped riser shall be constructed to bring the connection to within 0.9–1.5 m of ground level, or to such depth that will permit a gravity connection to service the whole lot.

Note: The MPDC Infrastructure Code of Practice provides acceptable details.