Return to home page

Part 4 – Stormwater Drainage

4.6    Stormwater System

Drainage systems both during construction and completion shall be designed such that principally only urban stormwater is conveyed. 

The Developer shall be responsible for ensuring that mechanisms exist to prevent water-borne litter, such as paper and plastics, and gross sediments from entering the system. Proposed design plans shall demonstrate how this is to be achieved.

Developers are required to provide for stormwater discharge on and from all lots.

On-site stormwater soakage for individual lots will form part of the building consent for each lot.